Author Nordwand Editorial Team Published 8 min read

Reading nature park guidance: permits and notifications

A hiker reads a color-coded sign showing mountain facilities and visitor areas

To find out whether you need a permit or notification, specify where you are going and what you intend to do. Use the ministry’s national park guidance to find the zone, applicable procedures and responsible office. Ask the relevant authority about conditions in quasi-national or prefectural natural parks.

Check the procedure for the activity and zone together

The ministry lists activities requiring permission in national parks by Special Zone, Special Protection Zone, Marine Park Zone and Regulated Utilization Zone, and provides application forms. Locate the site on the official zoning map and look up the activity.

In Special Zones, construction of structures and extraction of minerals, soil or stone are among the activities requiring a permit. In Special Protection Zones, the list also includes controlled burning, campfires, and collecting plants, fallen leaves or branches. Specify the location and scale to check the procedure and criteria.

Check who grants permission and where to submit documents. Tokyo handles part of national park permitting under a statutory delegation. Outside that scope the environment minister holds the authority. Ask the office for your destination who is responsible for your activity.

Check the notification deadline and when you may start

In Ordinary Zones, building, altering or extending large structures, installing advertisements and reshaping land are among the activities that require notification. When Article 33 of the Natural Parks Act applies, generally 30 days must elapse after notification before work can begin. The competent authority can shorten the period in some cases. In Special Zones and Special Protection Zones, other notifications cover work already under way at designation or emergency disaster measures. Check the deadline for the relevant procedure.

If a permit is required, obtain it and follow its conditions. If notification is required, check the form, deadline and earliest start date. Give the office the location, scale and methods if you need to verify an exemption.

Since 1 April 2022, applications and notifications addressed to the environment ministry go directly to the ministry, even in areas where a prefecture handles some delegated functions. Some matters fall under the prefectural governor’s authority. Ask the ministry’s local office or the prefectural department in advance where and how to file.

Permit review times vary by activity. During planning, check the required documents, deadlines and conditions for starting. Allow time for responses and review.

Check site conditions and other laws too

The ministry asks national park visitors to leave animals, plants and stones in place, stay on boardwalks and trails, camp and make fires in designated places, and take litter and cigarette butts home. Check legal restrictions for the specific activity and location.

The Kanto Regional Environment Office says that drone flights, takeoff and landing in a national park in themselves need no permit or notification under the Natural Parks Act. It also asks operators to consult land and facility managers, consider wildlife and other visitors, and check aviation law and rules for rivers and national forests.

Check permits, notifications and exemptions under the Natural Parks Act together with visitor guidance, other laws and site rules. Even when the Natural Parks Act requires no procedure, check the conditions for using the site.

Record what you have checked before leaving

Write down the activity, location and zone. Consult the ministry’s list or site guidance and note whether you need a permit, a notification, no procedure or further clarification. Record other applicable laws and facility conditions, and who issued the information and when it was updated.

A Chichibu-Tama-Kai National Park notice of 7 July 2011 explains that pitching a tent is generally subject to the Natural Parks Act outside places such as campgrounds. Check the latest park and facility information for current conditions and contacts.

If you plan to enter a designated area in a Special Zone, find out the precise area and dates. If you plan to put up an event sign in an Ordinary Zone, ask the office whether you need to notify it as an advertising display. Leave an activity out of your plan until you confirm the conditions that apply. To check a notice on site, stop on stable ground without blocking the way.

Give the responsible office the activity and zone

Identify the exact place and activity, then confirm the required permit or notification, where to file and when you may start. For anything unclear, use the contact in the park’s guidance and describe the section or work in detail.

References and sources

Find your mountain community

Find hiking partners and join communities. Plan your next adventure with Nordwand.