A Summit Above Loch Awe
Ben Cruachan's surveyed high point stands at 1,127 metres, placing it among the higher summits of the western Highlands. Loch Awe lies to the south, its waters serving as the lower reservoir in the hydroelectric scheme. Near the summit plateau, a dam created a separate upper reservoir entirely distinct from the loch below.
Engineering Inside the Mountain
Engineers excavated a generating hall directly inside the rock, housing turbines and machinery with no visible surface structure. A dam was constructed for the upper reservoir to supply the scheme. The station was officially opened on 15 October 1965, following the removal of vast quantities of rock from the mountain's core.
How Pumped Storage Works
When grid supply exceeds demand, surplus electricity pumps water from Loch Awe up into the upper reservoir, storing energy as elevated water. When demand rises, that water is released downward through rock tunnels to drive the turbines. Loch Awe alternates between receiving and supplying water across each cycle.